
6-Point Substrate Prep Checklist: Ensuring Safe Stacked Stone Installation on Drywall, Concrete, or Wood
How to Prep Drywall, Concrete, and Wood for Heavy Stacked Stone Panels. Avoid costly de-bonding and safety risks. This 7-point checklist covers moisture testing (ASTM F1869), load-bearing limits, and the essential 28-day concrete curing cycle. Discover the precision-engineered requirements for waterproofing, priming, and surface profiling needed to meet 2026 International Building Codes (IBC).







